Yak-54: TBOs and maintenance

Total airframe service life 3000 hours, 12000 landings, 20 years

The basic M-14X engine (the M-14P with the flat hub flange) has 2250 hh hours designed total life with the first overhaul at 750 hours, then every 500 hours with extensions available from the manufacturer. The optional 400 hp M-14PF has just entered mass production, so its TBO is actually of 250 hours, to be extended through inspections conducted in your area.

The maintenance schedule:

Maintenance level Schedule Manpower: Man x hours Duration
Before the 1st flight of the day Daily 0,5 15 - 25 min
Flight preparation Before every flight 0,4 15 min
After the last flight in the day Daily 0,9 30 min
Annual maintenance 12 month or 250 hh 80 10 to 15 hours
Biannual maintenance 24 month or 500 hh 120 25 to 30 hours
Overhaul 5 years 500 4 to 6 days
Our offer
Home - Aircraft & Sales - Service - Spare Parts